To provide adequate, high quality, reliable and uninterrupted power required for various needs of the research activities and the infrastructural requirements of the centre. To meet this Electrical Services Division designs, construct, operate, maintain and upgrade Electrical transmission and distribution system keeping in mind the system reliability & safety.
The division is also responsible for providing state of the art intercom telecommunication services to the plant site as well as for Energy conservation in the Electrical sphere through auditing and implementing various energy conservation measures.
Achievments
2021
Retrofitting Electro Mechanical relays with Numerical relays in CSS, NCSS-I, PDC-I, PDC-II, PDC-III, PDC-IV, RCL SS, GSB SS and CWS SS
2020
Commissioning of SCADA based substation monitoring system for CSS bus section A and PDC V substations.
Commissioning of PDC-X 6.6 kV Indoor sub-station.
Commissioning & integration of Phase-1 Grid-tied 340 kWp PV solar system at IGCAR parking area
2019
Commissioning of PDC-VII 11 kV Indoor sub-station.
Up-gradation of RCL substation DG set & AMF panel.
Revamping of PCC panel at RCL substation
2018
Commissioning of Pallavaram DAE Nodal facility 11 kV Indoor sub-station.
Commissioning & integration of Grid-tied 60 kWp PV solar system at PDC-II substation building
Commissioning & integration of Grid-tied 60 kWp PV solar system at PDC-VII substation building
Retrofitting of 33 kV BOCB-4 with VCB at CSS.
2015
Commissioning & integration of Grid-tied 30 kWp PV solar system at ESG Annex building.
Commissioning of PDC-IX 11 kV Indoor sub-station.
Commissioning of PDC-VIII 6.6 kV Indoor sub-station.
Expertise
Implementation of energy efficient DC LED light fixtures and fans for Office buildings to improve service life without any major maintenance.
Implementation of Lighting system with occupancy sensors for Lab/office building to conserve energy.
Implementaion of Exhaust fan control with weekly Timers for Lab/office building to conserve energy.
For System Improvement, Numerical Relay being developed by E& IG have been connected in 11 kV panel, CSS on a trial basis.