IGCAR MILE STONES


 
1971
- REACTOR RESEARCH CENTRE (RRC) ESTABLISHED
- FBTR CIVIL  CONSTRUCTION BEGINS
1972
- ENGINEERING HALLS
1973
- CENTRAL DESIGN OFFICE
1975
- REPROCESSING DEVELOPMENT LABORATORY
- CENTRAL WORKSHOP
- CENTRAL WATER CHILLING PLANT
1976
- SAFETY RESEARCH LABORATORY
- MATERIALS SCIENCE LABORATORY
1977
- RADIO METALLURGY LABORATORY
1978
- MATERIALS DEVELOPMENT LABORATORY
1980
- RADIOCHEMISTRY LABORATORY
1982
- COMPUTER CENTRE & ADMINISTRATION BUILDING
1983
- ELECTRONICS & INSTRUMENTATION LABORATORY
- PFBR FEASIBILITY REPORT
- HEALTH AND SAFETY LABORATORY
1985
- FBTR ATTAINED FIRST CRITICALITY  [ Oct. 1985 ]
- RRC RENAMED AS INDIRA GANDHI CENTRE FOR ATOMIC RESEARCH (IGCAR)  [ Dec. 1985 ]
1987
- LOW POWER EXPERIMENTS IN FBTR
1989
- REPROCESSING OF IRRADIATED THORIUM RODS FOR SEPARATION  OF U-233
1990
- SUBMISSION OF DETAILED PROJECT REPORT OF PFBR TO DAE / AEC
1991
- FBTR POWER LEVEL RAISED TO 1 MWt
- THREE COMPONENT SOUND DETECTION AND RANGING (SODAR) SYSTEM INSTALLED
1993
- FBTR POWER LEVEL RAISED TO 4 MWt  WITH STEAM WATER CIRCUITS
- FBTR POWER LEVEL RAISED TO 8 MWt (LHR 250W/cm)
- FBTR SUSTAINED  OPERATION AT 10.5 MWt (LHR 320 W/cm)
- PARTICLE IRRADIATION FACILITY (PIF) AND RADIO CHEMICAL HOT CELLS
   COMMISSIONED
1994
- RADIO METALLURGY  HOT CELLS COMMISSIONED
- FACILITY FOR TESTING LARGE  REACTOR COMPONENTS IN SODIUM COMMISSIONED
- SQUID, ASIC AND DIAMOND ANVIL CELL DEVELOPED
- HIGH POWER PHYSICS AND ENG. EXPERIMENTS IN FBTR
1995
- DECISION ON TWO LOOP DESIGN FOR PFBR
1996
- FBTR FUEL CROSSES 25,000 MWd/t BURN UP
- KAMINI REACTOR CRITICALITY [ Oct. 1996 ]
1997
- FBTR TURBO GENERATOR SYNCHRONIZED TO SOUTHERN GRID
- KAMINI REACTOR TAKEN TO FULL POWER
1998
- COMMISSIONING OF STRUCTURAL MECHANICS LAB
- PFBR MAIN VESSEL SECTOR FABRICATED FOR TECHNOLOGY DEVELOPMENT
1999
- IRRADIATION EXPERIMENTS IN FBTR FOR CREEP DATA ON ZIRCALOY&Zr-Nb ALLOYS
- FBTR FUEL SET TO REACH 50,000 MWd/t BURN UP LEVEL
- SODIUM PUMP TEST FACILITY SET UP FOR ROTOR DYNAMIC STUDIES
- STATE-OF-THE-ART NEUTRONIC CHANNELS COMMISSIONED FOR FBTR
2000 - CONSULTANTS APPOINTED FOR BOP DESIGN OF PFBR
2001 - BOR0N ENRICHMENT PLANT COMMISSIONED [ Apr. 2001 ]
- TECHNOLOGY DEVELOPMENT FOR MANUFACTURE OF INNER VESSEL SECTORS,
   SG EVAPORATOR, CSRDM AND DSRDM
- HYDRAULIC DEVELOPMENT OF PRIMARY SODIUM PUMP
- FOUNDATION STONE LAID FOR PFBR ADMINISTRATIVE  BUILDING
2002

- FBTR ACHIEVED A MAJOR LANDMARK OF REACHING FUEL BURN UP OF 100,000 MWd/t,
   WITHOUT ANY FUEL FAILURE
[ Sep. 2002 ]

- 10 t SEISMIC SHAKE TABLE COMMISSIONED

- MEASUREMENT STANDARD AND CALIBRATION FACILITY SET UP

- QUALITY ENGINEERING SERVICES AND TESTING FACILITY SET UP

- PFBR ADMINISTRATIVE BUILDING INAUGURATED

- SITE EXCAVATION FOR TRIAL BLASTING AND DEWATERING STUDIES

- CONSTRUCTION OF PFBR SITE ASSEMBLY SHOP COMMENCED

- LIQUID HELIUM PLANT COMMISSIONED

2003

- CONSTRUCTION OF STEAM GENERATOR TEST FACILITY  [ Mar. 2003 ]

- HYDRAULIC DEVELOPMENT OF SECONDARY SODIUM PUMP  [ Mar. 2003 ]

- TECHNOLOGY DEVELOPMENT FOR MANUFACTURE OF PFBR TRANSFER ARM [ Mar. 2003 ]

- COMMISSIONING OF 1.7 MeV TANDETRON ACCELERATOR

- DEMO FACILITY LEAD MINI CELL [LMC] COMMISSIONED FOR REPROCESSING OF
   FBTR CARBIDE FUEL ON LAB.SCALE
[ Mar. 2003 ]

- TECHNOLOGY DEVELOPMENT FOR PFBR STEAM GENERATOR EVAPORATOR COMPLETED
  
[ Mar. 2003 ]

- PFBR TEST SUBASSEMBLY LOADED INTO FBTR FOR IRRADIATION [ Jun. 2003 ]

- LOW BURN UP FBTR CARBIDE FUEL PINS CHOPPED AND DISSOLVED IN LMC [ Aug. 2003 ]

- BORON ENRICHMENT PLANT ACHIEVED 62% ENRICHMENT IN BORON-10 [ Aug. 2003 ]

- HIGH PURITY [90%] ELEMENTAL BORON PRODUCTION DEMONSTRATED [ Aug. 2003 ]

- ADMINISTRATIVE APPROVAL AND FINANCIAL SANCTION FOR CONSTRUCTION OF PFBR
   [ Sep. 2003 ]

- FORMATION OF NEW COMPANY "BHAVINI" FOR CONSTRUCTION OF PFBR [ Oct. 2003 ]

- FBTR CARBIDE FUEL REACHED A BURN UP OF 123,000 MWd/t [ Dec. 2003 ]

2004

- PIE OF 100,000 MWd/t IRRADIATED FBTR CARBIDE FUEL COMPLETED [ Jan. 2004 ]

- NEUTRON RADIOGRAPHY OF 100,000 MWd/t IRRADIATED FBTR FUEL CARRIED OUT
  [ Apr. 2004 ]

- CLEARANCE FROM SARCOP FOR REPROCESSING OF 25,000 MWd/t IRRADIATED
   FUEL FROM FBTR IN THE LMC
[ Nov. 2004 ]

- SGTF COMMISSIONED WITH SODIUM AT 2 MW, WITHOUT STEAM GENERATOR

- 25,000 MWd/t IRRADIATED FBTR FUEL PINS CHOPPED & DISSOLVED IN LMC [ Dec. 2004 ]

2005

- TESTING OF DSRDM IN SODIUM COMPLETED, EXCLUDING ENDURANCE TESTING [ Feb. 2005 ]

- REPROCESSING OF 50,000 MWd/t IRRADIATED FBTR FUEL PINS WAS COMPLETED
   [ Mar. 2005 ]

- TECHNOLOGY DEVELOPMENT FOR ALL THE CRITICAL OF PFBR WAS COMPLETED WITH THE
   GRID PLATE MANUFACTURED SUCCESSFULLY AT M/S. MTAR, HYDERABAD
 [ Mar. 2005 ]

- A FEW Kg  OF BORIC ACID ENRICHED TO 65 % WAS DELIVERED FOR PRODUCTION OF
   ENRICHED ELEMENTAL BORON [ Apr. 2005 ]

- AT THE END OF THE 12th IRRADIATION CAMPAIGN, IN MAY 2005, FBTR FUEL ACHIEVED A
   BURN UP OF 148,000 MWd/t AND PFBR TEST SA REACHED 52,000 MWd/t. [ May 2005 ]

- REPROCESSING OF 100,000 MWd/t IRRADIATED FBTR FUEL PINS WAS COMPLETED
   SUCCESSFULLY - WITH THIS , THE TECHNOLOGY FOR CLOSING THE FUEL CYCLE
   DEMONSTRATED [May 2005 ]